Keep mixers and pumps on the pour.

Maintenance software for ready-mix fleets: service by engine hours, breakdowns timed from production out to production in, and cost per cubic metre.

Wheel loader, concrete pump truck and staff bus in front of a city skyline

In ready-mix, a breakdown also costs the delivery behind it.

Mixers, pumps and plant work long shifts on rough site roads, and a missed pour cannot be rescheduled the way a parcel can. Knowing why machines stop, and what each cubic metre costs to deliver, decides the margin on each load.

  • A mixer down means a pour at riskWhen MX-214 stops at a site in Jeddah, the load behind it waits too, and the customer hears about it first.
  • Downtime with no breakdown of whyA machine out for four days could have waited three days for parts or three days for a bay. Each needs a different fix.
  • Cost that never meets volumeMaintenance sits in the ERP and cubic metres sit in the batching system, so cost per m3 is worked out by hand, if at all.

Built inside a ready-mix operation.

These are the records Tyre Pulse runs on today across Saudi Arabia, the UAE and Egypt.

machines on record
1,600+Mixers, pumps, loaders, generators and plant.
job cards
89,000+Imported from the ERP and worked in the app.
expense lines
216,000+Classified into tyres, spare parts and oil.
countries
3Saudi Arabia, the UAE and Egypt, each in its own currency.

How it works for a ready-mix fleet.

Plant engineers, the workshop and finance work from the same machine record.

  1. Plan service on the meter.Mixers, pumps, loaders and generators get service plans by engine hours, kilometres or calendar. Overdue work shows before it turns into a breakdown.
  2. Time every breakdown.Job cards record when the machine left production, entered and left the workshop, and returned. Waiting time and repair time are reported separately.
  3. Divide cost by concrete.Workshop, tyre and service-contract cost is divided by the approved cubic metres your plants delivered, by region and month.

Watch a breakdown and a service run to sign-off.

Breakdowns & workshop: See every machine that is off the road, who is on it, and whether time is lost to the repair or to waiting.

Step 1 of 4One tap with a photo. The machine shows up on the live workshop board at once.Sample data

Workshop
MX-308 · Riyadh · 06:58
Report a problemHydraulic leak at the drum motorMachine stopped1 photo
Workshop liveRiyadh · today
Out of production4
Technicians busy6 / 9
Waiting parts1
Utilisation71%
New 2MX-308Hydraulic leak, drum motorPB-063Belt noise
In progress 2WL-207Brake inspectionPT-118Tyre change LHF2
Waiting parts 1GN-305Fuel injector
Completed 1MX-214Tyre LHR1 replaced

What you need to start.

Your asset list and job cards are enough for the first view. Production volumes unlock cost per m3.

  • NeededYour asset listMixers, pumps, loaders, generators and plant with their codes and sites.
  • NeededJob card exportYour ERP or workshop job cards. We import them as they are, including the production and workshop times.
  • OptionalService intervalsYour current PM schedule by hours or kilometres. We can start from manufacturer intervals if none is written down.
  • OptionalDaily production volumesApproved cubic metres per plant per day, needed for cost per m3.
  • OptionalExpense linesParts, oil and tyre issues from your ERP, classified so cost per machine is complete.
  • OptionalTelematics or meter photosEngine hours from telematics, or drivers log the meter with a photo each day.

Questions plant managers ask.

Can it handle mixers, pumps and batching plant together?
Yes. Each machine type gets its own checklist, service plan and meter, hours for plant and pumps or kilometres for trucks, in the same register.
How is cost per m3 calculated?
Maintenance, tyre and service-contract cost for the period, divided by the approved cubic metres your plants delivered in that period. It is reported by region and month.
Does it replace our ERP?
No. Tyre Pulse imports job cards and expense lines from your ERP exports and adds the field, workshop and cost views the ERP does not give you.

See what your fleet costs per cubic metre.

Send a month of job cards and plant volumes. We split breakdowns from planned work, machine by machine.

Book a demo on your data